Brackenridge exterior.jpeg

Brackenridge Hall renovation to affect traffic

Fencing has gone up around Brackenridge Hall for the start of the renovation and expansion project. In addition to the outside areas that immediately surround the building, the staging area located on the east side of the north visitor parking lot also will be fenced.

The work will affect pedestrian and vehicular traffic along Bell Avenue and Administration Drive, which may be restricted to one lane on occasion. In addition, the pedestrian walks alongside Brackenridge Hall will be taken offline as needed and will be returned for use when possible. The contractor will construct barricades and place directional signs to protect and redirect pedestrians and vehicle traffic when appropriate.

The contractor and the university will take all safety measures related to the construction area. 

Be aware of your surroundings and the ongoing activity when passing the construction site.  

Weather permitting, construction is expected to continue through the spring of 2025, with a projected opening by fall 2025.